Environment

Environment

Information on the Project 【18-028】

Project Outline:

Construction of Lithium-ion battery factory

Reason of Categorization:

The project does not fall under the sensitive sectors, nor does it include sensitive characteristic, nor is it located in or near a sensitive area under the Environmental Guidelines. Its potential adverse impact are therefore not likely to be significant. Neither does it have significant impact on human rights under the Environmental Guidelines.

Documents that NEXI Obtained:

  • Environmental Impact Assessment Report 1-1 ( PDF/5MB )
  • Environmental Impact Assessment Report 1-2 ( PDF/17.6MB )
  • Environmental Permit Certificate 1 ( PDF/1.8MB )
  • Environmental Impact Assessment Report 2-1 ( PDF/4.4MB )
  • Environmental Impact Assessment Report 2-2 ( PDF/33.5MB )
  • Environmental Permit Certificate 2 ( PDF/2.2MB )

Environmental review

PAGE UP